Mumbai Metro: MMRDA Looking To Finalise Depot For Metro 9 Line Near Uttan — 2.5 Km Away From The Original Site
How The Shinde-Fadnavis Leadership Is Fast Tracking Transit Infrastructure In India's Financial Capital
Mumbai Metro: Final Trial Runs On Line-2A And Line-7 On 27 September, To Launch The Routes For Commercial Use In December